The Sunnica Energy Farm (Amendment) Order 2026

Amended the Sunnica Energy Farm Order 2024 to update several project plans and reference documents certified under the development consent.


This Order modifies the Sunnica Energy Farm Order 2024 by updating the list of certified documents that govern the energy farm's development.

It replaces specific rows in Schedule 10 of the original 2024 Order to incorporate updated versions of access and rights of way plans, the book of reference, land and Crown land plans, traffic regulation measures plans, and works plans.

These changes apply to the Sunnica Energy Farm project and the Secretary of State for Energy Security and Net Zero.

Arguments For

  • The Secretary of State asserts that the changes are non-material in nature and do not differ significantly from the changes proposed in the application.

  • The document states that the Secretary of State followed required procedures, including considering responses to publicity and consultation required by the 2011 Regulations.

  • The order updates certified documents in Schedule 10 to reflect newer versions of plans and books of reference, which proponents would argue ensures the legal framework matches the actual project requirements.

Arguments Against

  • Legal scholars or affected parties might question the classification of these changes as 'non-material,' as this designation bypasses the more rigorous examination required for 'material' changes under the Planning Act 2008.

  • Local residents or environmental groups might argue that updating land and works plans could change the physical footprint or impact of the project in ways not fully explored during the original consent process.

  • The complexity of referencing multiple versions of plans (e.g., different versions for different sheets of the land plans) could lead to implementation errors or confusion during the construction and operation phases.

Citation and commencement

  1. This Order may be cited as the Sunnica Energy Farm (Amendment) Order 2026 and comes into force on 22nd May 2026.

Amendment to the Sunnica Energy Farm Order 2024

  1. The Sunnica Energy Farm Order 2024 ('the 2024 Order') is amended as follows.

Amendments to Schedule 10 of the 2024 Order

  1. In Schedule 10, omit the following rows in the table-

| access and rights of way plans | 2.3 | 6 | 24/03/2023 | |----------------------------------|-------|-----|--------------| | book of reference | 4.3 | 9 | 30/08/2023 | |-------------------------------------------------------------|-------|-----|--------------| | land and Crown land plans | 2.1 | 6 | 30/01/2023 | |-------------------------------------------------------------|-------|-----|--------------| | traffic regulation measures plans - temporary road closures | 2.4 | 3 | 30/01/2023 | |-------------------------------------------------------------|-------|-----|--------------| | works plans | 2.2 | 5 | 03/03/2023 |

and replace with the following rows-

| access and rights of way plans | 2.3 | 7 | 27/11/2025 | |-------------------------------------------------------------|-------|-----|--------------| | book of reference | 4.3 | 10 | 27/11/2025 | |-------------------------------------------------------------|-------|-----|--------------| | land and Crown land plans - sheets 1-19 and 21-22 | 2.1 | 6 | 30/01/2023 | |-------------------------------------------------------------|-------|-----|--------------| | land and Crown land plans - sheet 20 | 2.1 | 7 | 27/11/2025 | |-------------------------------------------------------------|-------|-----|--------------| | traffic regulation measures plans - temporary road closures | 2.4 | 4 | 27/11/2025 | |-------------------------------------------------------------|-------|-----|--------------| | works plans | 2.2 | 6 | 27/11/2025 |

Related

The Air Navigation (Restriction of Flying) (Royal Air Force Coningsby) (No. 2) Regulations 2026

Fri 18th Sept 26

Established a temporary no-fly zone below 8,500 feet around RAF Coningsby for a flying display on 26 September 2026.

Read More

The Building Safety Levy (Amendment) (England) Regulations 2026

Fri 18th Sept 26

Adjusted the Building Safety Levy framework to exclude student housing from dwelling definitions and refined the criteria for previously developed land.

Read More

The Street Works (Charges for Occupation of the Highway) (No. 2) Order 2026

Fri 18th Sept 26

Authorized fourteen local authorities to charge daily fees for roadworks carried out during busy times on specific highways.

Read More

The Plant Health, Seeds, Seed Potatoes and Plant Propagating Material (Amendment) (Northern Ireland) Regulations 2026

Fri 18th Sept 26

Updated Northern Ireland's plant health and seed marketing laws to align with the Windsor Framework and EU standards.

Read More