Made under the Pollution Prevention and Control Act 1999
3 statutory instruments made using powers in the Pollution Prevention and Control Act 1999, newest first. Each one is explained section by section in plain English.
The Environmental Permitting (Waste Controlling or Transporting) and Relevant Functions of Primary Authorities (Amendment) (England) Regulations 2026
Transferred the regulation of waste carriers and brokers into the environmental permitting framework and introduced new identification requirements for waste transport drivers.
These Regulations integrate the regulation of waste carriers, brokers, and dealers into the Environmental Permitting (England and Wales) Regulations 2016 framework, replacing the previous registration system under the Control of Pollution (Amendment) Act 1989 in England.
They establish three new classes of regulated facilities: waste controlling activity, waste transporting activity, and waste controlling-transporting activity, making them subject to environmental permits or specific exemptions.
The Environment Agency is designated as the regulator for these activities, which include duties to apply the waste hierarchy and carry identification during transport.
The rules apply to businesses, charities, and individuals involved in the moving, buying, selling, or arranging for the disposal of waste in England.
The Bathing Water (Amendment) (England and Wales) Regulations 2025
- Department: Department for Environment, Food and Rural Affairs
- Made under: Pollution Prevention and Control Act 1999
The Regulations amended definitions, introduced new criteria for identifying bathing waters based on feasibility and safety, allowed for flexible bathing season determination, modified management measures for 'poor' waters, and updated pollution reporting and monitoring requirements.
These Regulations, enacted by the Secretary of State for England and the Welsh Ministers for Wales under the Pollution Prevention and Control Act 1999, amend the primary Bathing Water Regulations 2013.
The changes involve updating definitions, establishing new criteria to restrict the identification of bathing waters based on feasibility, cost, or safety risks, granting flexibility in setting the official bathing season duration, modifying procedures for waters classified as 'poor' for five consecutive years by introducing a reconsideration period, and updating requirements for monitoring and reporting short-term pollution and annual data.
The Environmental Permitting (Electricity Generating Stations) (Amendment) Regulations 2025
- Department: Department for Energy Security and Net Zero
- Made under: Pollution Prevention and Control Act 1999
Established new decarbonisation readiness requirements for power stations in England through mandatory technical assessments and feasibility studies for environmental permits.
The regulations establish new requirements for electricity generating stations in England to demonstrate their readiness for future decarbonisation through either carbon capture and storage (CCS) or hydrogen conversion.
Operators must submit detailed technical and economic feasibility assessments when applying for environmental permits, proving they can meet specific conditions for either CCS readiness or hydrogen conversion readiness.
The regulations replace existing Carbon Capture Readiness requirements and extend to both inland and territorial waters adjacent to England.