The Net Zero Teesside (Amendment) Order 2026
Increased the permitted inner diameters for the heat recovery steam generator and absorber stacks at the Teesside infrastructure site.
This Order modifies the design parameters for the Net Zero Teesside carbon capture and power project by increasing the permitted inner diameters of two specific stacks.
It directs that the inner diameter for the heat recovery steam generator stack be increased from 6.5 meters to 9.0 meters and the absorber stack be increased from 6.6 meters to 7.0 meters.
The order applies to the developers and operators authorized under the original 2024 development consent order, administered by the Department for Energy Security and Net Zero.
Arguments For
The order states that the Secretary of State considered the application and responses to publicity and consultation required by the 2011 Regulations.
The document asserts that the changes are not materially different from those proposed in the initial application for the non-material change.
Proponents of the order rely on powers granted under paragraphs 2(1) and (9) of Schedule 6 to the Planning Act 2008 to modify existing development consent orders.
Arguments Against
Legal challenges to non-material change orders often focus on whether the alterations are sufficiently minor to bypass the more rigorous examination required for material changes.
Environmental groups or local residents might raise concerns regarding the impact of increased stack diameters on visual amenity or emissions dispersion compared to the original consent.
Technical experts could question whether the increase in inner diameters from 6.5m to 9.0m and 6.6m to 7.0m implies a larger operational scale than originally assessed.
Citation and commencement
- This Order may be cited as the Net Zero Teesside (Amendment) Order 2026 and comes into force on 29th July 2026.
This section establishes the official name of the legislation for legal purposes.
It sets the date the legal changes take effect as 29 July 2026.
Amendment to the Net Zero Teesside Order 2024
- The Net Zero Teesside Order 2024 ('the 2024 Order') is amended as follows.
This provision identifies the Net Zero Teesside Order 2024 as the primary legislation being modified.
It serves as a procedural instruction that the subsequent text alters the terms of that previous order.
Amendment to Schedule 15 (design parameters) of the 2024 Order
- In Schedule 15 (design parameters), Table 14 is amended as follows-
(a) In the row labelled 'Heat recovery steam generator stack', before '(inner diameter)', for '6.5 m' substitute '9.0 m'; and
(b) In the row labelled 'Absorber stack', before '(inner diameter)', for '6.6 m' substitute '7.0 m'.
This section alters the specific physical requirements for the project's infrastructure.
It increases the permitted inner diameter of the heat recovery steam generator stack by 2.5 meters and the absorber stack by 0.4 meters.
These design parameters are legally binding limits on the dimensions of the structures that may be built under the development consent.
Related
The Air Navigation (Restriction of Flying) (Derry, Londonderry) Regulations 2026
Restricted unmanned aircraft flight in Derry/Londonderry during the Halloween Festival on 31 October 2026.
Read MoreThe Family Procedure (Amendment No. 2) Rules 2026
Updated the procedural framework for the Family Court to review and manage prohibited steps orders issued by the Crown Court.
Read MoreThe Pedicabs (London) (Amendment) Regulations 2026
Updated insurance requirements, booking procedures, and commencement dates for the regulation of London pedicabs.
Read MoreThe Air Navigation (Restriction of Flying) (Llanelli, Carmarthenshire) Regulations 2026
Established a temporary no-fly zone for drones in Llanelli on 20 November 2026 to protect public safety during a large gathering.
Read More