81 statutory instruments made by the Department for Energy Security and Net Zero, newest first. Each one is explained section by section in plain English.
The Code Manager Selection (Competitive) Regulations 2025
- Department: Department for Energy Security and Net Zero
- Made under: Energy Act 2023
The Gas and Electricity Markets Authority established a competitive selection process for code managers of designated documents, including eligibility criteria, conflict of interest management, selection criteria, and public notice requirements.
The Code Manager Selection (Competitive) Regulations 2025 establish a framework for the Gas and Electricity Markets Authority to competitively select code managers for designated documents.
The regulations detail eligibility requirements, conflict-of-interest provisions, selection criteria, notice publication procedures, and provisions for cancellation or disqualification.
The selection process includes an open or restricted procedure, with the Authority publishing notices at each stage and considering any representations received.
The Electricity (Individual Exemption from the Requirement for a Supply Licence) (JG Pears Power Limited) (England) Order 2025
- Department: Department for Energy Security and Net Zero
- Made under: Electricity Act 1989
A temporary exemption from the electricity supply license requirement was granted to JG Pears Power Limited to supply electricity to High Marnham Green Energy Business Park in England.
This order temporarily exempts JG Pears Power Limited from needing an electricity supply license to provide power to the High Marnham Green Energy Business Park in England.
The exemption, granted under the Electricity Act 1989, runs until December 31, 2034, and is subject to conditions limiting the maximum electricity supply to 37 megawatts.
The order's justification involves facilitating the prompt delivery of renewable energy while acknowledging a lack of significant impact on the public or private sectors.
The Immingham Open Cycle Gas Turbine (Amendment) (No. 3) Order 2025
- Department: Department for Energy Security and Net Zero
- Made under: Planning Act 2008
The Immingham Open Cycle Gas Turbine Order 2020 was amended to clarify definitions, land acquisition processes, and certified documents.
This order amends the Immingham Open Cycle Gas Turbine Order 2020 to incorporate non-material changes.
The Secretary of State approved the changes following an application under the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011.
Key amendments include modifications to definitions of ‘book of reference’ and ‘Order land,’ alterations to compulsory land acquisition provisions, and revisions to schedules detailing land rights and certified documents.
These changes aim for greater clarity and efficiency in the project’s implementation.
The Rivenhall Generating Station Extension (Correction) Order 2025
- Department: Department for Energy Security and Net Zero
- Made under: Planning Act 2008
The Rivenhall Generating Station Extension (Correction) Order 2025 corrected errors in the 2024 order regarding definitions within Article 2(1) by removing references to the Companies Act 2006.
The Rivenhall Generating Station Extension (Correction) Order 2025 amends the 2024 order granting development consent under the Planning Act 2008.
It addresses errors identified in the original order regarding definitions within Article 2(1), specifically removing erroneous references to the Companies Act 2006 concerning "the 2006 Act," "holding company," and "subsidiary." The Secretary of State made the correction following a formal written request, notifying relevant local planning authorities.
The Ferrybridge Multifuel 2 Power Station (Amendment) Order 2025
- Department: Department for Energy, Security and Net Zero
- Made under: Planning Act 2008
The 2025 Order amended the Ferrybridge Multifuel 2 Power Station Order 2015 to clarify the definition of processed municipal solid waste.
The Ferrybridge Multifuel 2 Power Station (Amendment) Order 2025, effective April 28th, 2025, amends the 2015 Order.
It clarifies the definition of "processed municipal solid waste" within the 2015 Order by including waste types specified in several EU decisions (2000/532/EC, 2001/118/EC, 2001/119/EC, 2001/573/EC, and 2014/955/EU).
This change addresses an application for non-material change, aiming for better clarity in waste processing regulations within the power station's operation.
The Energy (Euratom Decisions and Miscellaneous Provisions) (Amendment and Revocation) Regulations 2025
- Department: Department for Energy Security and Net Zero
- Made under: Retained EU Law (Revocation and Reform) Act 2023
The regulations revoked 37 obsolete Euratom decisions and related miscellaneous provisions concerning energy, along with certain legacy transitional provisions related to environmental impact assessments.
The Energy (Euratom Decisions and Miscellaneous Provisions) (Amendment and Revocation) Regulations 2025 revoke 37 obsolete instruments, mostly related to the UK's former Euratom membership.
These regulations also revoke legacy transitional provisions concerning environmental assessments for electricity and pipeline works.
The changes simplify UK energy law, remove redundant provisions, and align the legal framework with the post-Brexit regulatory environment.
The Oil and Gas Authority (Carbon Storage) (Retention of Information and Samples) Regulations 2025
- Department: Department for Energy Security and Net Zero
- Made under: Energy Act 2023, Energy Act 2008
The regulations established requirements for retaining carbon storage information and samples, defining categories of information and samples, setting retention periods, and outlining procedures for license termination.
The Oil and Gas Authority (Carbon Storage) (Retention of Information and Samples) Regulations 2025, effective May 13, 2025, establish mandatory retention periods for carbon storage information and samples held by licensees.
The regulations cover various categories of information including survey, well, site, injection, production, monitoring, and installation data, specifying retention periods until a relevant event occurs or an information plan takes effect.
Similar requirements are outlined for the retention of samples, with stipulations about disposal notification and timeframes.
The regulations also address scenarios where a carbon storage license terminates, transferring responsibilities to a defined ‘responsible person’.
The Ecodesign for Energy-Related Products and Energy Information (Amendment) (Northern Ireland) Regulations 2025
- Department: Department for Energy Security and Net Zero
- Made under: European Union (Withdrawal) Act 2018
The 2025 regulations amended the Ecodesign for Energy-Related Products and Energy Information Regulations in Northern Ireland to reflect the Windsor Framework's provisions on EU law.
These regulations amend existing legislation in Northern Ireland to incorporate the latest EU ecodesign requirements for energy-related products and energy labelling.
The changes, implemented under the Windsor Framework, update the lists of products and their associated regulations, ensuring compliance with EU law.
Specific products covered include tumble dryers, space heaters, and smartphones, with staggered implementation dates.