Energy Legislation
Legislative framework for energy production, distribution, renewable sources, nuclear power, and energy efficiency standards.
The Ecodesign for Energy-Related Products and Energy Information (Amendment) (Northern Ireland) Regulations 2025
The 2025 regulations amended the Ecodesign for Energy-Related Products and Energy Information Regulations in Northern Ireland to reflect the Windsor Framework's provisions on EU law.
These regulations amend existing legislation in Northern Ireland to incorporate the latest EU ecodesign requirements for energy-related products and energy labelling.
The changes, implemented under the Windsor Framework, update the lists of products and their associated regulations, ensuring compliance with EU law.
Specific products covered include tumble dryers, space heaters, and smartphones, with staggered implementation dates.
The Hornsea Four Offshore Wind Farm (Amendment) Order 2025
The Hornsea Four Offshore Wind Farm Order 2023 was amended to revise the definition of the offshore compensation measures and modify the guillemot compensation process.
The Hornsea Four Offshore Wind Farm (Amendment) Order 2025 amends the 2023 Order to make non-material changes to bycatch reduction measures.
Specifically, it revises the definition of "the offshore compensation measures" and modifies paragraphs 10-12 of Part 3 of Schedule 16, related to guillemot compensation, by updating consultation processes, predator eradication methods, and notification requirements.
The changes were made following an application under the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011 and are effective from April 14, 2025.
The Heckington Fen Solar Park (Correction) Order 2025
The Heckington Fen Solar Park (Correction) Order 2025 corrected errors in the original 2025 Order, amending references and coordinates within various articles and schedules.
This order corrects errors in the Heckington Fen Solar Park Order 2025, a development consent order under the Planning Act 2008.
The Secretary of State approved corrections based on a written request from the applicant, which were then notified to the relevant local planning authorities.
The corrections amend several sections of the original order, updating references and coordinates, particularly in Schedules 1 and 13.
The effective date is April 14, 2025.
The National Grid (Bramford to Twinstead Reinforcement) (Correction) Order 2025
The 2025 Order corrected errors and omissions in the National Grid (Bramford to Twinstead Reinforcement) Order 2024.
The National Grid (Bramford to Twinstead Reinforcement) (Correction) Order 2025 rectifies errors and omissions in the 2024 Order, a development consent order under the Planning Act 2008.
The Secretary of State received a request for corrections and subsequently issued this order detailing specific textual changes across multiple articles and schedules of the 2024 Order, impacting definitions, articles defining development consent and procedures, along with specific provisions relating to the project.
The order ensures the legal framework for the project is accurate.
The Road Vehicles (Construction and Use) (Amendment) Regulations 2025
The 2025 regulations amended the 1986 Road Vehicles (Construction and Use) Regulations to allow road use of hydrogen-fuelled vehicles, while introducing safety standards for hydrogen fuel systems.
The Road Vehicles (Construction and Use) (Amendment) Regulations 2025 amend the 1986 Regulations to permit road use of hydrogen-fuelled agricultural vehicles, engineering plant, works trucks, and category T tractors.
The amendments introduce new safety requirements for hydrogen fuel systems, including stipulations for fuelling receptacles, pressure relief devices, leak prevention, and driver warnings.
These requirements align with UNECE regulations and aim to balance enabling the use of hydrogen technology with ensuring public and environmental safety.
The Power to Award Degrees etc. (Engineering College of Technology Limited) Order 2025
The Office for Students authorized Engineering College of Technology Limited to grant taught awards up to the master's level in engineering and technology subjects for a fixed term.
The Power to Award Degrees etc. (Engineering College of Technology Limited) Order 2025 authorizes Engineering College of Technology Limited to grant taught awards up to the master's level in specified engineering and technology subjects.
The authorization, effective April 1, 2025, and expiring April 1, 2029, follows advice from the relevant body and is based on the Higher Education and Research Act 2017.
The Order lists specific subjects covered and requires that award recipients be enrolled at the college at the time of course completion.
An impact assessment was deemed unnecessary due to the lack of impact on businesses, civil society organizations, or the public sector.
The Electricity (Individual Exemption from the Requirement for a Transmission Licence) (Spiorad na Mara) (Scotland) Order 2025
The Order exempted Spiorad na Mara Limited from the requirement for an electricity transmission licence for its offshore generating station in Scotland.
The Electricity (Individual Exemption from the Requirement for a Transmission Licence) (Spiorad na Mara) (Scotland) Order 2025 grants an indefinite exemption from the requirement for Spiorad na Mara Limited to hold an electricity transmission licence for the transmission of electricity from its offshore generating station in the Isle of Lewis to an onshore substation.
The Secretary of State made the order under powers granted by the Electricity Act 1989, after consultation with Scottish Ministers, based on the unique circumstances of the offshore project.
The exemption applies to Scotland only, takes effect on May 7, 2025 and does not require a full impact assessment due to the anticipated lack of significant impact on the public or private sectors.
The Certification of Fuels and Fireplaces (Charges) (England) Regulations 2025
The Certification of Fuels and Fireplaces (Charges) (England) Regulations 2025 were enacted, setting charges for wood fuel, manufactured solid fuel, and fireplace certifications to fund the associated compliance and auditing processes.
These regulations establish charges for the certification of wood fuel, manufactured solid fuels, and fireplaces in England, under the Clean Air Act 1993 and the Air Quality (Domestic Solid Fuels Standards) (England) Regulations 2020.
The regulations detail the specific charges for various application types and supplier categories, including initial applications, recertification, compliance checks, and audits.
These are payable to appointed assessment bodies and are intended to fund the certification process, which helps enforce smoke control measures and contributes to cleaner air, in line with the UK's obligations under the Gothenburg Protocol.