Infrastructure Legislation

Regulations governing public works, infrastructure development, construction standards, and facility maintenance.

The Borough Council of Calderdale (Elland Station and West Vale Access Package) (West Yorkshire Plus Transport Fund, Transforming Cities Fund) (Calder and Hebble Navigation Bridge) Scheme 2022 Confirmation Instrument 2025

Published: Tue 25th Nov 25 Came into force: Thu 4th Dec 25

The Secretary of State for Transport confirmed the Borough Council of Calderdale's scheme to construct a pedestrian and cycle bridge over the Calder and Hebble Navigation as part of the Elland Station and West Vale Access Package.


The Secretary of State for Transport confirms the Borough Council of Calderdale’s Scheme, enacted under the Highways Act 1980, which authorizes the construction of a multi-span bridge over the Calder and Hebble Navigation.

This bridge is a component of the Elland Station and West Vale Access Package, intended to provide essential pedestrian and cycle access to the proposed Elland Rail Station from the north bank, while ensuring navigational requirements of the waterway are met.

Read More

The Electricity (Individual Exemption from the Requirement for a Transmission Licence) (Dogger Bank A) (Amendment) Order 2025

Published: Wed 19th Nov 25 Came into force: Thu 18th Dec 25

* Extended the electricity transmission licence exemption for the Dogger Bank A Offshore Wind Farm for one year, from December 2025 to December 2026.


The Secretary of State made this Order under powers granted by the Electricity Act 1989 to amend the existing 2025 Order concerning the Dogger Bank A Offshore Wind Farm.

This amendment specifically extends the date until which the project is exempt from the requirement to hold an electricity transmission licence, changing the expiry date from December 19, 2025, to December 18, 2026, and the Order applies to England, Wales, and Scotland.

Read More

The A1 in Northumberland: Morpeth to Ellingham Development Consent (Revocation) Order 2025

Published: Thu 13th Nov 25 Came into force: Fri 14th Nov 25

The Secretary of State for Transport formally revoked the A1 in Northumberland: Morpeth to Ellingham Development Consent Order 2024, making the revocation effective from November 14th, 2025.


This Order formally revokes the A1 in Northumberland: Morpeth to Ellingham Development Consent Order 2024 under the authority granted by the Planning Act 2008, following the Secretary of State determining that exceptional circumstances warranted discontinuation of the development consent without a formal application for revocation being submitted.

Read More

The East Sussex County Council (Exceat Bridge Replacement – A259 Eastbourne Road) Bridge Scheme 2023 Confirmation Instrument 2025

* The Secretary of State for Transport confirmed the East Sussex County Council's scheme for replacing the Exceat Bridge on the A259 Eastbourne Road, legally enacting the project with specified modifications.


This Instrument, enacted by the Secretary of State for Transport, legally confirms, with modifications, the East Sussex County Council’s scheme to replace the existing Exceat Bridge located on the A259 Eastbourne Road over the Cuckmere River; the confirmation authorizes the construction of a new single-span bridge structure adhering to specified dimensions, waterway clearances, and access provisions, and the Instrument comes into force upon the publication of its confirmation notice.

Read More

The Access to the Countryside (Coastal Margin) (Portsmouth to South Hayling) Order 2025

Published: Wed 12th Nov 25 Came into force: Wed 12th Nov 25

The Order appointed 12th November 2025 as the end date for the access preparation period concerning the coastal margin for the Portsmouth to South Hayling section of the England Coast Path.


This Order, made by the Secretary of State under powers derived from the Countryside and Rights of Way Act 2000, formally appoints 12th November 2025 as the day the access preparation period ends for the coastal margin associated with the England Coast Path route covering Portsmouth to South Hayling, referencing previous approvals of Natural England’s inspection reports.

Read More

The A122 (Lower Thames Crossing) Development Consent (Amendment) (No. 2) Order 2025

Published: Wed 5th Nov 25 Came into force: Wed 5th Nov 25

The Secretary of State successfully executed an amendment to the A122 (Lower Thames Crossing) Development Consent Order 2025, specifically altering the timing requirement for a financial agreement concerning the Kent Downs National Landscape.


The Secretary of State for Transport has issued this Order, following an application for a non-material change, specifically to amend Article 65 of the A122 (Lower Thames Crossing) Development Consent Order 2025, which concerns the financial arrangements provided by National Highways Limited for the benefit of the Kent Downs National Landscape.

Read More

The A122 (Lower Thames Crossing) Development Consent (Amendment) Order 2025

Published: Wed 5th Nov 25 Came into force: Wed 5th Nov 25

The Order amended the A122 (Lower Thames Crossing) Development Consent Order 2025 to modify environmental mitigation commitments related to air quality and the Epping Forest SAC.


This Order amends the A122 (Lower Thames Crossing) Development Consent Order 2025 following an application for a non-material change concerning environmental mitigation measures for the Epping Forest Special Area of Conservation (SAC).

The amendment specifically replaces a commitment in the Code of Construction Practice register regarding air quality effects, mandating the implementation of appropriate technology to enable a 60mph westbound speed limit enforcement zone on the M25 between junctions 26 and 27, coupled with detailed monitoring, reporting, and appropriate funding arrangements to prevent Adverse Effect on Integrity (AEoI) from nitrogen deposition.

Read More

The Net Zero Teesside (Amendment) Order 2025

Published: Tue 4th Nov 25 Came into force: Wed 29th Oct 25

The Secretary of State enacted The Net Zero Teesside (Amendment) Order 2025, making non-material changes to the Net Zero Teesside Order 2024, including introducing new work items and amendments to land acquisition powers and supporting documentation.


The Secretary of State has used powers under the Planning Act 2008 to implement a non-material change to the Net Zero Teesside Order 2024, formalised by this Order taking effect on October 29th, 2025.

This amendment updates definitions within the Order, specifically introducing and refining terms like 'book of reference,' 'Order land,' and introducing 'supplemental land.' Key changes involve adding 'Work No. 6A' (above-ground installations) to the authorised development, restricting the undertaker's powers to survey or compulsorily acquire interests in the new 'supplemental land,' and updating several schedules related to certified documents, protective provisions, and land plans.

Read More